Skip to main content

“Data Interpretation Pie Chart Questions with Solutions | SBI, IBPS, RRB 2026”

Data Interpretation — Tourist Distribution & Work Efficiency (Verified)

Hey Aspirants! 👋

Data Interpretation sets based on Tourist Distribution and Work-Efficiency Calculations are extremely important for SBI, IBPS, RRB (PO/Clerk) and SSC exams. Let's practice both complete sets with step-by-step solutions. 🎯 पर्यटक वितरण और कार्य-क्षमता गणना पर आधारित Data Interpretation के ये दोनों सेट्स SBI, IBPS, RRB और SSC परीक्षाओं के लिए बेहद महत्वपूर्ण हैं। आइए स्टेप-बाय-स्टेप सॉल्यूशन के साथ 10 महत्वपूर्ण प्रश्नों का अभ्यास करें। 🎯
✅ Note: every option below was independently recalculated directly from the pie chart data and the table, with full working shown in each solution. Pie charts are rendered as precise SVGs, with each wedge angle and label position calculated from the exact percentages/values — not estimated. ✅ नोट: नीचे हर उत्तर पाई चार्ट डेटा और तालिका से स्वतंत्र रूप से दोबारा निकाला गया है, और हर हल में पूरा तरीका दिखाया गया है। पाई चार्ट सटीक SVG में बनाए गए हैं, जहां हर हिस्से का कोण और लेबल की जगह वास्तविक प्रतिशत/मूल्यों से निकाली गई है।

1️⃣ Quick Recap: Important Formulas / जरूरी फॉर्मूले

Central Angle: Angle = Given % × 3.6°  (since 100% = 360°)
Work & Efficiency: Total Work = Efficiency × Time
केंद्रीय कोण निकालने के लिए प्रतिशत को 3.6° से गुणा करें। कुल कार्य = दक्षता × समय।
📊 Section 1 — Tourist Distribution Set (Q1–Q5)
Directions (Q.1–5): Study the following two pie charts and information carefully.
- Total tourists from USA, Canada and England = 5500
- Total tourists from USA = 2500 (so Canada + England together = 3000)
निर्देश (प्रश्न 1–5): निम्नलिखित दोनों पाई चार्ट और जानकारी का ध्यानपूर्वक अध्ययन करें।
USA Tourists Only
Total = 2,500
A 22% B 24% C 14% D 18% E 22%
City A
City B
City C
City D
City E
USA + Canada + England
Total = 5,500
A 18% B 20% C 12% D 16% E 34%
City A
City B
City C
City D
City E
1. Find the central angle of E of the total tourists? कुल पर्यटकों में से E का केंद्रीय कोण ज्ञात कीजिए?
(A) 132.60°    (B) 122.40°    (C) 108.20°    (D) 144.80°    (E) None of these
▶ View Solution / हल देखें
Percentage for City E (5500 pie) = 34% Central Angle = 34 × 3.6° = 122.40° Ans: (B) 122.40°
2. In tourists from city A, Canada tourists are 120 more than that of tourists from England. Then find the number of tourists from Canada in city A? शहर A के पर्यटकों में, जिसमें कनाडा के पर्यटक इंग्लैंड के पर्यटकों की तुलना में 120 अधिक हैं। तो शहर A में कनाडा से पर्यटकों की संख्या ज्ञात कीजिए?
(A) 240    (B) 190    (C) 210    (D) 280    (E) None of these
▶ View Solution / हल देखें
Total tourists in City A = 18% of 5500 = 990 USA tourists in City A = 22% of 2500 = 550 Canada + England in City A = 990 − 550 = 440 England = x, Canada = x+120 → 2x+120 = 440 → x = 160 Canada tourists = 160 + 120 = 280 Ans: (D) 280
3. Find the difference between the total number of tourists from Canada and England in city E with the total number of tourists from Canada and England in city D? शहर E में कनाडा और इंग्लैंड के पर्यटकों की कुल संख्या और शहर D में कनाडा और इंग्लैंड के पर्यटकों की कुल संख्या के बीच का अंतर ज्ञात कीजिए?
(A) 890    (B) 780    (C) 1060    (D) 920    (E) None of these
▶ View Solution / हल देखें
City E: Total = 34% of 5500 = 1870; USA = 22% of 2500 = 550 → Canada+England = 1320 City D: Total = 16% of 5500 = 880; USA = 18% of 2500 = 450 → Canada+England = 430 Difference = 1320 − 430 = 890 Ans: (A) 890
4. Find the ratio of total number of USA tourists from city B to that of total number of tourists from city D? शहर B से संयुक्त राज्य अमेरिका के पर्यटकों की कुल संख्या का शहर D से पर्यटकों की कुल संख्या से अनुपात ज्ञात कीजिए?
(A) 11:17    (B) 23:14    (C) 15:22    (D) 35:19    (E) None of these
▶ View Solution / हल देखें
USA tourists in City B = 24% of 2500 = 600 Total tourists in City D = 16% of 5500 = 880 Ratio = 600 : 880 = 15 : 22 Ans: (C) 15:22
5. If the total number of male to that of female tourists from Canada and England in city C is 3:2, then find the number of male tourists from Canada and England in city C? यदि शहर C में कनाडा और इंग्लैंड से आए पुरुष पर्यटकों की कुल संख्या 3:2 है, तो शहर C में कनाडा और इंग्लैंड से आए पुरुष पर्यटकों की संख्या ज्ञात कीजिए?
(A) 174    (B) 186    (C) 192    (D) 195    (E) None of these
▶ View Solution / हल देखें
Total in C = 12% of 5500 = 660 USA in C = 14% of 2500 = 350 Canada + England in C = 660 − 350 = 310 Male share = 3/5 × 310 = 186 Ans: (B) 186
📊 Section 2 — Work & Efficiency Set (Q6–Q10)
Directions (Q.6–10): Study the following pie chart and table carefully. The pie chart gives information about the number of days taken by A to complete 5 different works. निर्देश (प्रश्न 6–10): दिए गए पाई चार्ट और तालिका को ध्यान से देखें।
Days A Takes, Per Job
A's solo time on each job
Painting60 days Cleaning25 days Gardening20 days Mowing40 days Cultivating70 days
Painting
Cleaning
Gardening
Mowing
Cultivating

Work Details, Efficiency Ratio & Combined Days

Work (कार्य)A : B EfficiencyDays taken by B and C together
Painting (पुताई)2 : 140
Cleaning (सफाई)3 : 510
Gardening (बागवानी)3 : 45
Mowing (कटाई)8 : 524
Cultivating (खेती)3 : 220
6. A and B together started mowing a field but after 20 days they left the work and C completed the remaining work. In how many days total was the work completed? A और B ने मिलकर घास काटना शुरू किया लेकिन 20 दिनों के बाद उन्होंने काम छोड़ दिया और C ने शेष काम पूरा किया?
(A) 25.2 days    (B) 27 days    (C) 27.2 days    (D) 23.8 days    (E) None of these
▶ View Solution / हल देखें
A:B = 8:5, A takes 40 days → total work = 8×40 = 320 units; A's eff=8, B's eff=5 B+C together take 24 days → (B+C) eff = 320/24 = 40/3; C's eff = 40/3 − 5 = 25/3 A+B work 20 days: 13×20 = 260 units; remaining = 320−260 = 60 C alone: 60 ÷ 25/3 = 7.2 days → total = 20 + 7.2 = 27.2 days Ans: (C) 27.2 days
7. A, B and C together started painting but after 10 days A and B left the work then how many days C alone will take to complete the remaining work? A, B और C ने मिलकर पुताई करना शुरू किया लेकिन 10 दिनों के बाद A और B ने काम छोड़ दिया?
(A) 35 days    (B) 25 days    (C) 20 days    (D) 42 days    (E) None of these
▶ View Solution / हल देखें
A:B = 2:1, A takes 60 days → total work = 2×60 = 120 units; A's eff=2, B's eff=1 B+C together take 40 days → (B+C) eff = 120/40 = 3; C's eff = 3 − 1 = 2 A+B+C work 10 days: 5×10 = 50 units; remaining = 120−50 = 70 C alone: 70 ÷ 2 = 35 days Ans: (A) 35 days
8. B worked alone to do cleaning but once 25% of the work was complete B left the work and A joined in place of him. Once 80% of the remaining work was completed, A left and C joined. How many days in total did the work take? B अकेले सफाई का कार्य करता है लेकिन 25% कार्य पूरा हो जाने पर B कार्य छोड़ देता है और A उसके स्थान पर जुड़ जाता है। शेष का 80% पूरा होने पर A छोड़ देता है और C उसके स्थान पर आ जाता है। कुल कितने दिन लगे?
(A) 26.75 days    (B) 28.5 days    (C) 21.25 days    (D) 28.75 days    (E) 23.25 days
▶ View Solution / हल देखें
A:B = 3:5, A takes 25 days → total work = 3×25 = 75 units; A's eff=3, B's eff=5 B+C together take 10 days → (B+C) eff = 75/10 = 7.5; C's eff = 7.5 − 5 = 2.5 B does 25% = 18.75 units → time = 18.75÷5 = 3.75 days Remaining 56.25 units; A does 80% of it = 45 units → time = 45÷3 = 15 days Remaining 11.25 units; C finishes: 11.25÷2.5 = 4.5 days Total = 3.75 + 15 + 4.5 = 23.25 days Ans: (E) 23.25 days
9. If A, B and C together started cultivating and complete the work together, then how many fewer days would they take compared to B working alone? यदि A, B और C मिलकर खेती का काम करना शुरू करते हैं और एक साथ काम पूरा करते हैं, तो B के अकेले काम पूरा करने की तुलना में वे कितने दिन कम लगाते हैं?
(A) 60 5/7 days    (B) 50 5/7 days    (C) 65 5/7 days    (D) 55 5/7 days    (E) None of these
▶ View Solution / हल देखें
A:B = 3:2, A takes 70 days → total work = 3×70 = 210 units; A's eff=3, B's eff=2 → B alone = 210/2 = 105 days B+C together take 20 days → (B+C) eff = 210/20 = 10.5; C's eff = 10.5 − 2 = 8.5 A+B+C eff = 3+2+8.5 = 13.5 → together time = 210/13.5 = 15 5/9 days Days saved vs B alone = 105 − 15 5/9 = 89 4/9 days — this does not match any given option Ans: (E) None of these
10. If A started gardening and worked for 4 days and left off, then B and C start to do the remaining work. In how many days will the work be completed? यदि A ने बागवानी करना शुरू किया, 4 दिनों के लिए कार्य किया और छोड़ दिया तो B और C शेष कार्य करना शुरू कर देते हैं। कार्य कितने दिनों में पूरा होगा?
(A) 12 days    (B) 10 days    (C) 6 days    (D) 8 days    (E) None of these
▶ View Solution / हल देखें
A:B = 3:4, A takes 20 days → total work = 3×20 = 60 units; A's eff=3, B's eff=4 B+C together take 5 days → (B+C) eff = 60/5 = 12 A works 4 days: 3×4 = 12 units done; remaining = 60−12 = 48 B+C finish remaining: 48÷12 = 4 days Total time from start = 4 + 4 = 8 days Ans: (D) 8 days

✅ Final Answer Key (Verified — All 10 Questions)

Q1 → (B) | Q2 → (D) | Q3 → (A) | Q4 → (C) | Q5 → (B)
Q6 → (C) | Q7 → (A) | Q8 → (E) | Q9 → (E) | Q10 → (D)

Comments

Popular posts from this blog

Ratio and Proportion Quiz for SSC CGL, CHSL & RRB | 25 PYQ Mock Test

Ratio & Proportion Challenge — Mathnija Hey Aspirants! 👋 🌙 📊 Ratio & Proportion Challenge 25 real exam questions • mock test 25 Questions 60s Per Question Timer 🔥 Streak Bonus 🔢 How many questions do you want to play? 10 Quick 15 Medium 25 Full Test ℹ️ Best score is saved only for the Full Test (25 questions). 📌 How to Play / कैसे खेलें? ⏱️ You get 60 seconds per question. The faster you answer correctly, the more ⚡ points you earn (10 to 20). हर प्रश्न के लिए 60 सेकंड मिलेंगे। जितना जल्दी सही उत्तर दोगे, उतने ज़्यादा ⚡ अंक मिलेंगे (10 से 20)। 🔥 Your streak grows with every consecutive correct answer. It resets on a wrong answer or a time-out. लगातार सही उत्तर देने पर स्ट्रीक बढ़ती है। गलत उत्तर या समय समाप्त होने पर स्ट्रीक रीसेट हो जाती है। 🆘 2 lifelines , each usable once: ✂️ 50-50 (removes 2 wrong options) and ⏱️ +15s (extra time). 2 लाइफलाइन , हर एक सिर्फ़ 1 बार: ✂️ 50-50 (2 गलत विकल्प हट जाते हैं) और ⏱️ +15s (अतिरिक्त समय)। 💡 A shortcut trick...

HCF & LCM Speed Challenge (30 Questions) for SSC CGL/CHSL & Railway | महत्तम समापवर्तक और लघुत्तम समापवर्त्य

HCF & LCM Challenge - Mathnija Hey Aspirants! HCF & LCM Challenge SSC CGL / CHSL / Railway style • speed mock test 20 Questions 40s Per Question Streak Bonus Kitne sawaal khelne hain? 10 15 20 Full Kaise khelein / कैसे खेलें? 40 seconds per question. Jitna jaldi sahi, utne zyada points (10 se 20). Streak 3+ par har sahi jawab par +5 bonus points. Galat ya time-out par streak reset. 2 lifelines, ek-ek baar: 50-50 aur +15s. Har jawab ke baad trick dikhegi. Result par topic-wise accuracy aur galat sawaal. Start / शुरू करो Home 50-50 +15s Accuracy Best Streak Avg Speed WhatsApp par Share Karo Sirf Galat Wale Phir Se Kamzor Topic Practice Phir Se Khelo Home Mathnija रटना नहीं, समझना है!

Square & Cube — Speed Quiz Challenge (40 Questions) वर्ग और घन

Square & Cube Challenge — Mathnija Hey Aspirants! 👋 Squares, cubes and their roots are the fastest-scoring topic in SSC/Bank exams — if you know them by heart. This speed round tests exactly that. 🎯 वर्ग, घन और उनके मूल SSC/Bank परीक्षाओं में सबसे तेज़ स्कोर दिलाने वाला टॉपिक है — बस याद पक्का होना चाहिए। यह स्पीड राउंड ठीक यही जाँचता है। 🎯 🧮 Square & Cube Speed Challenge 40 real SSC/Bank exam sawaal • speed round 40 Questions 60s Per Q Timer 🔥 Streak Bonus Squares, Cubes, √ aur ∛ — sab mix milega. Sahi jawab par streak badhta hai, galat ya time-out par streak reset. End me apna score aur weak spots dekh sakte ho. 🚀 Shuru Karo Q 1 / 40 Score: 0 🔥 0 SQUARE 14³ = ? 🏆 0/40 Shandaar! 0...